Do you dare to say and understand what projects are included in the final decoration project?

   Are you in search of an honest and dependable decoration company that offers exceptional value for money, ensures top-notch quality for your entire home customization, furniture customization, and comprehensive interior decoration, all while delivering a delightful surprise for your cozy new home? If so, please reach out to us.

   Contact Number:081-656-5808,Email:[email protected]

As the final stage of decoration, if the finishing project is successfully completed, a complete home will be presented in front of you. But do you know specifically which projects are included? It’s okay if you don’t know, below the editor will count them one by one for everyone.

  1. Cabinet installation

After the ceiling is finished, you can arrange for the cabinet to be installed on your doorstep. If everything goes smoothly, it can be completed in one day. At the same time, a sink (excluding plumbing fittings) and a gas stove are also installed. It is best to coordinate with the property management to connect the gas before installing the cabinet, as gas testing is required after the gas stove is installed.

  1. Wooden door installation

The production cycle of wooden doors is generally one month, so in order to ensure a tight schedule, it is necessary to have the wooden door manufacturer come to the door as soon as possible after the main body is dismantled and modified to measure the size of the door opening. Regarding the handling of door openings, everyone needs to pay attention to one thing. If the height of the door openings at home is not consistent, workers need to handle them to the same height to make them look good.

  1. Floor installation

On the second day after installing the wooden door, the floor can be installed, and if everything goes smoothly, it will take one day. Attention should be paid to the following issues during floor installation: Before installing the floor, it is best to have the manufacturer come to inspect whether the ground needs to be leveled or partially leveled; And the floor of the house should be cleaned thoroughly to ensure dryness, so do not use water during the cleaning process.

  1. Installation of switch sockets

Generally, switches are turned on and off with the opposite hand, and the right hand is used more than the left hand. So, most of the switches in the house are installed on the left side of the entrance, which is convenient to open with the right hand after entering. Consistent with behavioral logic.

  1. Installation of lighting fixtures

The color of the lamp can be white, yellow, and blue (purple). Do not use other colors, especially red and green. The former is simply a pornographic venue, while the latter has become a terrifying zone. After installing the lights, the house lit up, bidding farewell to the glaring light of the 100 watt incandescent bulb during the renovation period.

  1. Installation of hardware and sanitary ware

Install all the previously purchased plumbing fittings, bathroom accessories, toilets, drying racks, and more. After the installation of the “big items” in the front, the house is still very “cold”. After the lighting fixtures and hardware are installed, the house is “alive”

Original article, author:SUNNY COTTAGE CO., L,If reproduced, please indicate the source:https://www.decorationbydiana.com/22276/

Like (0)
Donate Scan with WeChat Scan with WeChat
Previous 2025-07-21
Next 2025-07-21

Related recommendations

Leave a Reply

Your email address will not be published. Required fields are marked *

Contact phone number

081-656-5808

Sunny Cottage Co., Ltd
1143/1 Srinakarin Road, Suan Luang Subdistrict, Suan Luang District, Bangkok 10250
Service Hours
Working days: Monday to Friday Time: 9:00-18:00
Phone number:
081-656-5804, 081-656-5808
email
[email protected]